Multi-Utilities Project
Scope of works-
1. Install approx 10km of PE water main from 63mm to 355mm including ductile iron.
2. Install approx 3 km of PE gas main from 315mm to 400mm.
3. Install approx 15km of site communication ducts.
4. Install approx 42km of HV, LV & avionic service duct.
5. Directional Drill 2.5 km of 200mm rising main.
6. Directional Drill numerous PE crossings from 110mm to 315mm SDR11
7. Construction of Concrete bases